


Copper Lead Zinc Mining
These bins give a total capacity of 270 tons of lead concentrate, 320 tons of copper concentrate, and 460 tons of zinc concentrate. The piping and distributing system is arranged so that one bin is being filled while the other is draining. If required, the concentrates can be further dried by oil fired heating plates.