Petra Diamonds | Cullinan Mine
FY 2023 to FY 2025 production, cost and capex guidance for the Cullinan Mine remain unchanged. Our production guidance for FY 2023 is between 4.1 and 4.3 Mt ROM material to be treated, and ROM grade of between 36.5 and 38.5cpht, including the ore from the portions of the current mining area, the C-Cut, that is lower grade and higher in density.